True / False
1. Systems requests seldom are aimed at improving service to users within a company.
a. True
b. False
ANSWER: False
2. Internal and external factors affect every business decision that a company makes, and IT systems are no exception.
a. True
b. False
ANSWER: True
3. A strategic plan that stresses technology tends to create an unfavorable climate for IT projects that extends throughout
an organization.
a. True
b. False
ANSWER: False
4. As users rely more heavily on information systems to perform their jobs, they are likely to request even more IT
services and support.
a. True
b. False
ANSWER: True
5. Information systems that interact with customers usually receive low priority.
a. True
b. False
ANSWER: False
6. Competition drives many information systems decisions.
a. True
b. False
ANSWER: True
7. Economic activity has a negligible influence on corporate information management.
a. True
b. False
ANSWER: False
8. Most large companies rely on one person to evaluate systems requests instead of relying on a systems review
committee.
a. True
b. False
ANSWER: False
Copyright Cengage Learning. Powered by Cognero.
Page 1
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
9. When assessing schedule feasibility, a systems analyst must consider the interaction between time and costs.
a. True
b. False
ANSWER: True
10. The first step in evaluating feasibility is to accept and include all systems requests, even those that are not feasible.
a. True
b. False
ANSWER: False
11. Feasibility analysis is an ongoing task that must be performed throughout the systems development process.
a. True
b. False
ANSWER: True
12. The purpose of an interview, and of the preliminary investigation itself, is to convince others that a project is justified,
not to uncover facts.
a. True
b. False
ANSWER: False
Modified True / False
13. It is easier to assign dollar values to intangible benefits.
ANSWER: False – tangible
14. The Pareto chart, sometimes called a scatter diagram, is a problem solving tool.
ANSWER: False – XY chart
15. In a preliminary investigation report, the findings section includes a summary of a project request and a specific
recommendation.
ANSWER: False – recommendations
Multiple Choice
16. The term _____ refers to the reasons, or justifications, for a proposal.
a. business case
b. use case
c. work statement
d. problem charter
ANSWER: a
Copyright Cengage Learning. Powered by Cognero.
Page 2
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
17. Systems development typically starts with a _____.
a. feasibility study, followed by a systems request, which includes a preliminary investigation
b. systems request, followed by a preliminary investigation, which includes a feasibility study
c. preliminary investigation, followed by a feasibility study, which includes a systems request
d. feasibility study, followed by a preliminary investigation, which includes a systems request
ANSWER: b
18. _____ planning is the process of identifying long-term organizational goals, strategies, and resources.
a. Prospect
b. Pilot
c. Strategic
d. Vertical
ANSWER: c
19. Strategic planning starts with a _____ that reflects a firmโs vision, purpose, and values.
a. relationship diagram
b. feasibility study
c. performance assessment
d. mission statement
ANSWER: d
20. _____ usually focus on long-term challenges and goals, the importance of a firmโs stakeholders, and a commitment to
the firmโs role as a corporate citizen.
a. Performance assessments
b. Relationship assessments
c. Vision statements
d. Mission statements
ANSWER: d
21. A _____ must be achieved to fulfill a companyโs mission.
a. key performance factor
b. core competency
c. critical success factor
d. vision competency
ANSWER: c
22. The overall aim of a _____ is to avoid seeking goals that are unrealistic, unprofitable, or unachievable.
a. SWOT (Strength, Weakness, Opportunities, and Threats) analysis
b. CSF (Critical Success Factor) analysis
c. BCF (Business Case Factor) analysis
d. SWCT (Strategy, Weakness, Cost, and Technology) analysis
ANSWER: a
Copyright Cengage Learning. Powered by Cognero.
Page 3
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
23. Hardware-based security controls include _____.
a. password fields
b. online forms
c. system patterns
d. biometric devices
ANSWER: d
24. _____ limitations result when a system that was designed for a specific hardware configuration becomes obsolete
when new hardware is introduced.
a. Accessibility
b. Relationship
c. Feasibility
d. Performance
ANSWER: d
25. _____ technology uses radio frequency identification (RFID) tags to identify and monitor the movement of each
individual product, from a factory floor to the retail checkout counter.
a. EPC (Electronic product code)
b. EPOD (Electronic proof of delivery)
c. MCC (Magnetic character code)
d. RTPD (Real-time product delivery)
ANSWER: a
26. _____ components can provide automated response to sales inquiries, online order processing, and inventory tracking.
a. Just-in-time (JIT)
b. Customer relationship management (CRM)
c. Automatic teller machine (ATM)
d. Total cost of ownership (TCO)
ANSWER: b
27. Electronic data interchange (EDI) enables _____ inventory systems, which rely on computer-to-computer data
exchange to minimize unnecessary inventory.
a. CRM (Customer relationship management)
b. EPOD (Electronic proof of delivery)
c. JIT (Just-in-time)
d. RFID (Radio frequency identification)
ANSWER: c
28. Many companies implement _____ systems that integrate all customer-related events and transactions.
a. CRM (Customer relationship management)
b. TCO (Total cost of ownership)
c. JIT (Just-in-time)
d. RFID (Radio frequency identification)
ANSWER: a
Copyright Cengage Learning. Powered by Cognero.
Page 4
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
29. Using _____, a supplier can use radio frequency identification (RFID) tags on each crate, case, or shipping unit to
create a digital shipping list.
a. EPOD (Electronic proof of delivery)
b. PPOD (Physical proof of delivery)
c. RPS (Radio positioning system)
d. RDS (Radar detection system)
ANSWER: a
30. The objective of a _____ is to use the combined judgement and experience of several analysts to evaluate systems
projects.
a. computer resources committee
b. data storage committee
c. system networking committee
d. topology identification committee
ANSWER: a
31. _____ means that a proposed system will be used effectively after it has been developed.
a. Operational feasibility
b. Technical feasibility
c. Schedule feasibility
d. Economic feasibility
ANSWER: a
32. _____ refers to the practical resources needed to develop, purchase, install, or operate a system.
a. Operational feasibility
b. Technical feasibility
c. Schedule feasibility
d. Market feasibility
ANSWER: b
33. _____ includes ongoing support and maintenance costs, as well as acquisition costs.
a. CRC (Customer relationship costs)
b. TCO (Total cost of ownership)
c. JIT (Just-in-time costs)
d. RCT (Real cost of time)
ANSWER: b
34. Of the measures of feasibility, questions such as โDoes management support the project?โ and โWill the new system
require training for users?โ would help predict a systemโs _____.
a. schedule feasibility
b. technical feasibility
c. economic feasibility
d. operational feasibility
ANSWER: d
Copyright Cengage Learning. Powered by Cognero.
Page 5
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
35. Of the measures of feasibility, questions such as โDoes the proposed platform have sufficient capacity for future
needs?โ and โWill the hardware and software environment be reliable?โ should be considered while assessing _____.
a. schedule feasibility
b. technical feasibility
c. economic feasibility
d. ethical feasibility
ANSWER: b
36. _____ means that the projected benefits of a proposed system outweigh the estimated costs.
a. Economic feasibility
b. Schedule feasibility
c. Operational feasibility
d. Technical feasibility
ANSWER: a
37. Which of the following is an example of a tangible benefit?
a. A user-friendly system that improves employee job satisfaction
b. A sales tracking system that supplies better information for marketing decisions
c. A new website that enhances a companyโs image
d. An online package tracking system that improves service and decreases the need for clerical staff
ANSWER: d
38. Which of the following is an example of an intangible benefit?
a. A user-friendly system that improves employee job satisfaction
b. A new scheduling system that reduces overtime
c. An online package tracking system that improves service and decreases the need for clerical staff
d. A sophisticated inventory control system that cuts excess inventory
ANSWER: a
39. _____ are the benefits that can be measured in dollars.
a. Tangible benefits
b. Intangible benefits
c. Ethical benefits
d. Agile benefits
ANSWER: a
40. _____ are advantages that are difficult to measure in dollars but are important to a company.
a. Tangible benefits
b. Intangible benefits
c. Tactile benefits
d. Real benefits
ANSWER: b
Copyright Cengage Learning. Powered by Cognero.
Page 6
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
41. _____ result from a decrease in expenses, an increase in revenues, or both.
a. Tangible benefits
b. Intangible benefits
c. Agile benefits
d. Ethical benefits
ANSWER: a
42. Of the measures of feasibility, _____ assesses tangible and intangible benefits to a company in addition to costs.
a. schedule feasibility
b. technical feasibility
c. economic feasibility
d. operational feasibility
ANSWER: c
43. _____ means that a project can be implemented in an acceptable time frame.
a. Operational feasibility
b. Technical feasibility
c. Schedule feasibility
d. Economic feasibility
ANSWER: c
44. When assessing _____, a systems analyst must consider the interaction between time and costs.
a. resource feasibility
b. technical feasibility
c. schedule feasibility
d. market feasibility
ANSWER: c
45. Projects that provide the _____ are assigned the highest priority when setting priorities for systems requests.
a. greatest benefit, at the lowest cost, in the shortest period of time
b. greatest benefit, at the highest cost, in the shortest period of time
c. least benefit, at the lowest cost, in the longest period of time
d. least benefit, at the highest cost, in the longest period of time
ANSWER: a
46. Which of the following is an example of a discretionary project?
a. Creating a new report for a user
b. Adding a report required by a new federal law
c. Including annual updates to payroll and tax percentages
d. Updating quarterly changes in reporting requirements for an insurance processing system
ANSWER: a
Copyright Cengage Learning. Powered by Cognero.
Page 7
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
47. Projects where management has a choice in implementing them are called _____ projects.
a. discretionary
b. nondiscretionary
c. appended
d. concatenated
ANSWER: a
48. Projects where management has no choice in implementing them are called _____ projects.
a. discretionary
b. nondiscretionary
c. appended
d. concatenated
ANSWER: b
49. A systems analyst conducts a preliminary investigation to study the _____ and recommend specific action.
a. systems request
b. project scheduling report
c. systems validation
d. project staffing report
ANSWER: a
50. A popular technique for investigating causes and effects is called a _____ diagram.
a. causebone
b. fishbone
c. jawbone
d. crossbone
ANSWER: b
51. A _____ is an analysis tool that represents the possible causes of a problem as a graphical outline.
a. causebone diagram
b. fishbone diagram
c. jawbone diagram
d. crossbone diagram
ANSWER: b
52. When using a _____ to investigate the causes of a problem, an analyst first states the problem and then draws a main
bone with sub-bones that represent possible causes of the problem.
a. causebone diagram
b. fishbone diagram
c. jawbone diagram
d. crossbone diagram
ANSWER: b
Copyright Cengage Learning. Powered by Cognero.
Page 8
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
53. Determining the _____ means defining the specific boundaries, or extent, of a project.
a. project index
b. project matrix
c. project scope
d. project table
ANSWER: c
54. To avoid the problem of _____, a projectโs scope should be defined as clearly as possible.
a. project dilation
b. project expansion
c. project creep
d. project drift
ANSWER: c
55. Projects with very general scope definitions are at risk of expanding gradually, without specific authorization, in a
process called _____.
a. project dilation
b. project creep
c. project expansion
d. project drift
ANSWER: b
56. A _____ is a requirement or condition that a system must satisfy or an outcome that a system must achieve.
a. trigger
b. constraint
c. query
d. key
ANSWER: b
57. The objective of _____ is to gather data about project usability, costs, benefits, and schedules.
a. mediation
b. fact-finding
c. project execution
d. project maintenance
ANSWER: b
58. A(n) _____ is not as flexible as a series of interviews, but it is less expensive, generally takes less time, and can
involve a broad cross-section of people.
a. fishbone
b. experiment
c. survey
d. research
ANSWER: c
Copyright Cengage Learning. Powered by Cognero.
Page 9
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
59. The _____, named after a nineteenth-century economist, is a widely used tool for visualizing issues that need attention
and is drawn as a vertical bar graph.
a. Pareto chart
b. Gantt chart
c. Scatter chart
d. XY chart
ANSWER: a
60. A _____ is a summary of a project request and a specific recommendation.
a. case for action
b. routine report
c. breakdown report
d. case for approval
ANSWER: a
61. In a preliminary investigation report, the _____ section contains a brief description of the system, the name of the
person or group performing the investigation, and the name of the person or group who initiated the investigation.
a. introduction
b. recommendations
c. expected benefits
d. time and costs estimates
ANSWER: a
62. In a preliminary investigation report, the _____ section contains the results of the preliminary investigation, including
a description of the projectโs scope, constraints, and feasibility.
a. appendix
b. introduction
c. recommendations
d. findings
ANSWER: d
63. In a preliminary investigation report, the _____ section is included in the report if supporting information must be
attached.
a. appendix
b. introduction
c. recommendations
d. findings
ANSWER: a
Copyright Cengage Learning. Powered by Cognero.
Page 10
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
CASE
Critical Thinking Questions
Case 2-1
Lara, managing director of an information technology firm, has received a big project from one of their highly valuable
clients. However,
the project received is different from the usual projects they handle.
64. Lara performs certain analyses and ensures that the companyโs image will not be at risk by taking this project. This is
an example of _____.
a. operational feasibility
b. economic feasibility
c. technical feasibility
d. schedule feasibility
ANSWER: a
65. Lara is involved in many other projects so she appoints a project manager for this project to ensure that the project is
completed on time. This is an example of _____.
a. operational feasibility
b. economic feasibility
c. technical feasibility
d. schedule feasibility
ANSWER: d
Multiple Response
66. A SWOT (Strength, Weakness, Opportunities, and Threats) analysis contributes to the strategic planning process by
examining a firmโs _____ resources.
a. technical
b. human
c. financial
d. logistical
ANSWER: a, b, c
67. The main reasons for systems requests are _____.
a. improved services to customers
b. reduced support for new products and services
c. better performance
d. reduced cost
ANSWER: a, c, d
Copyright Cengage Learning. Powered by Cognero.
Page 11
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
68. _____ are external factors that shape corporate IT choices.
a. Technology
b. Competitors
c. Managers
d. Suppliers
ANSWER: a, b, d
69. _____ are internal factors that shape corporate IT choices.
a. Technology
b. User requests
c. Strategic plan
d. Company finances
ANSWER: b, c, d
Matching
Identify the letters of the choices that best match the sentences or definitions.
a. Schedule feasibility
b. Electronic product code
c. Customer relationship management components
d. Systems development
e. Electronic proof of delivery
f. Systems request
g. Just-in-time
h. Preliminary investigation
i. Organization chart
j. Case for action
70. It typically starts with a systems request, followed by a preliminary investigation, which includes a feasibility study.
ANSWER: d
71. This might propose enhancements for an existing system, the correction of problems, or the development of an
entirely new information system.
ANSWER: f
72. It is a system that provides the right products at the right place at the right time.
ANSWER: g
73. It is a technology that is expected to overshadow bar code technology in the future.
ANSWER: b
74. They provide automated responses to sales inquiries, online order processing, and inventory tracking.
ANSWER: c
Copyright Cengage Learning. Powered by Cognero.
Page 12
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
75. With this application, a supplier can use radio frequency identification (RFID) tags on each crate, case, or shipping
unit to create a digital shipping list.
ANSWER: e
76. When assessing this, a systems analyst must consider the interaction between time and costs.
ANSWER: a
77. Its end product is a report to management.
ANSWER: h
78. It shows formal reporting relationships of a group.
ANSWER: i
79. It is a summary of a project request and a specific recommendation.
ANSWER: j
Essay
Copyright Cengage Learning. Powered by Cognero.
Page 13
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
80. Discuss in detail the six main reasons for systems requests, including examples where appropriate.
AN The six main reasons for systems requests are stronger controls, reduced cost, more information, better performance,
SW improved service to customers, and more support for new products and services.
ER:
Stronger controls: A system must have effective controls to ensure that data is secure and accurate. Some common
security controls include passwords, various levels of user access, and encryption, or coding of data to keep it safe
from unauthorized users. Hardware-based security controls include biometric devices that can identify a person by a
retina scan or by mapping a fingerprint pattern. The technology uses infrared scanners that create images with
thousands of measurements of hand and finger characteristics. In addition to being secure, data also must be accurate.
Controls should minimize data entry errors whenever possible. For example, if a user enters an invalid customer
number, the order processing system should reject the entry immediately and prompt the user to enter a valid number.
Data entry controls must be effective without being excessive. If a system requires users to confirm every item with
an โAre you sure? Y/Nโ message, internal users and customers might complain that the system is not user-friendly.
Reduced cost: The current system could be expensive to operate or maintain as a result of technical problems, design
weaknesses, or the changing demands of a business. It might be possible to adapt the system to newer technology or
upgrade it. On the other hand, cost-benefit analysis might show that a new system would be more cost effective and
provide better support for long-term objectives.
More information: A system might produce information that is insufficient, incomplete, or unable to support the
companyโs changing information needs. For example, a system that tracks customer orders might not be capable of
analyzing and predicting marketing trends. In the face of intense competition and rapid product development cycles,
managers need the best possible information to make major decisions on planning, designing, and marketing new
products and services.
Better performance: The current system might not meet performance requirements. For example, it might respond
slowly to data inquiries at certain times, or it might be unable to support company growth. Performance limitations
also result when a system that was designed for a specific hardware configuration becomes obsolete when new
hardware is introduced.
Improved service: Systems requests often are aimed at improving service to customers or users within a company.
For instance, allowing mutual fund investors to check their account balances on a website, storing data on rental car
customer preferences, or creating an online college registration system are all examples of providing valuable services
and increased customer satisfaction.
More support for new products and services: New products and services often require new types or levels of IT
support. For example, a software vendor might offer an automatic upgrade service for subscribers, or a package
delivery company might add a special service for radio frequency identification (RFID)-tagged shipments. In
situations like these, it is most likely that additional IT support will be required. At the other end of the spectrum,
product obsolescence can also be an important factor in IT planning. As new products enter the marketplace, vendors
often announce that they will no longer provide support for older versions. A lack of vendor support would be an
important consideration in deciding whether or not to upgrade.
Copyright Cengage Learning. Powered by Cognero.
Page 14
Name:
Class:
Date:
Chapter 2 โ Analyzing the Business Case
81. Describe in detail the internal factors that affect the business decisions a company makes.
AN Internal factors include the strategic plan, top managers, user requests, information technology department, existing
SW systems and data, and company finances.
ER:
Strategic plan: A companyโs strategic plan sets the overall direction for a firm and has an important impact on IT
projects. Company goals and objectives that need IT support will generate systems requests and influence IT
priorities. A strategic plan that stresses technology tends to create a favorable climate for IT projects that extends
throughout the organization.
Top managers: Because significant resources are required, top management usually initiates large-scale systems
projects. Those decisions often result from strategic business goals that require new IT systems, more information for
decision making, or better support for mission-critical information systems.
User requests: As users rely more heavily on information systems to perform their jobs, they are likely to request
even more IT services and support. For example, sales reps might request improvements to a companyโs website, a
more powerful sales analysis report, a network to link all sales locations, or an online system that allows customers to
obtain the status of their orders instantly. Or, users might not be satisfied with the current system because it is difficult
to learn or lacks flexibility. They might want information systems support for business requirements that did not even
exist when the system was developed.
Information technology department: Systems project requests come from the IT department. IT staff members
often make recommendations based on their knowledge of business operations and technology trends. IT proposals
might be strictly technical matters, such as replacement of certain network components, or suggestions might be more
business oriented, such as proposing a new reporting or data collection system.
Existing systems and data: Errors or problems in existing systems can trigger requests for systems projects. When
dealing with older systems, analysts sometimes spend too much time reacting to day-to-day problems without looking
at underlying causes. This approach can turn an information system into a patchwork of corrections and changes that
cannot support the companyโs overall business needs. This problem typically occurs with legacy systems, which are
older systems that are less technologically advanced. When migrating to a new system, IT planners must plan the
conversion of existing data.
Company finances: A companyโs financial status can affect systems projects. If the company is going through a
difficult time, the project may be postponed until there is more cash available to finance the effort. On the other hand,
if the company is enjoying financial success, the decision to embark on a new project may be easier to make.
Copyright Cengage Learning. Powered by Cognero.
Page 15
Document Preview (15 of 201 Pages)
User generated content is uploaded by users for the purposes of learning and should be used following SchloarOn's honor code & terms of service.
You are viewing preview pages of the document. Purchase to get full access instantly.
-37%
Systems Analysis and Design, 11th Edition Test Bank
$18.99 $29.99Save:$11.00(37%)
24/7 Live Chat
Instant Download
100% Confidential
Store
Liam Anderson
0 (0 Reviews)
Best Selling
The World Of Customer Service, 3rd Edition Test Bank
$18.99 $29.99Save:$11.00(37%)
Chemistry: Principles And Reactions, 7th Edition Test Bank
$18.99 $29.99Save:$11.00(37%)
Test Bank for Hospitality Facilities Management and Design, 4th Edition
$18.99 $29.99Save:$11.00(37%)
Solution Manual for Designing the User Interface: Strategies for Effective Human-Computer Interaction, 6th Edition
$18.99 $29.99Save:$11.00(37%)
Data Structures and Other Objects Using C++ 4th Edition Solution Manual
$18.99 $29.99Save:$11.00(37%)
2023-2024 ATI Pediatrics Proctored Exam with Answers (139 Solved Questions)
$18.99 $29.99Save:$11.00(37%)